Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction 


Vol. 37,  No. 6, pp. 50-59, Dec.  2022
10.14346/JKOSOS.2022.37.6.50


PDF
  Abstract

In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

  Statistics
Cumulative Counts from November, 2022
Multiple requests among the same browser session are counted as one view. If you mouse over a chart, the values of data points will be shown.


  Cite this article

[IEEE Style]

김민호 and 신성우, "Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction," Journal of the Korean Society of Safety, vol. 37, no. 6, pp. 50-59, 2022. DOI: 10.14346/JKOSOS.2022.37.6.50.

[ACM Style]

김민호 and 신성우. 2022. Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction. Journal of the Korean Society of Safety, 37, 6, (2022), 50-59. DOI: 10.14346/JKOSOS.2022.37.6.50.