The interest in the Building Information Modeling (BIM) technology has risen remarkably due to the effects on construction work period reduction, cost reduction, work safety improvement, and other factors. In civil engineering field, BIM applications mainly focus on data modeling and virtual construction. In this study, we present the BIM-based virtual construction and analyze the effects of BIM for the railway facilities so that the conventional approach to the equipment operation plan can be improved in order to prevent safety accidents which can result from unclear information during the operation plan. The BIM-based virtual construction technology is applied to establish the construction plan for the site with constraints, the installation of steel girder needs to be completed, avoiding interference with the existing high-speed railway operation within a given limited time. A virtual construction model consisting of topography, structures, equipments, and avatar was built and more detailed model, including safety guard rails, was then created. Specifications of the construction equipment were input as a database, and the virtual construction model was manipulated in the equipment operation planning. Through the BIM-based virtual construction, including the verification of alternative construction method, 311 million won was saved and the construction period was shortened by 87 days compared to the original plan. In addition, it was shown that the interest and participation of the construction workers can be increased by providing the 3D virtual scene for real construction work and various safety hazards occurring during equipment operation can be effectively removed in advance by the interactive worker education.

  Statistics
Cumulative Counts from November, 2022
Multiple requests among the same browser session are counted as one view. If you mouse over a chart, the values of data points will be shown.


  Cite this article

[IEEE Style]

박준원, 이상호, 김성훈, 원정훈, 윤영철, "BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway," Journal of the Korean Society of Safety, vol. 33, no. 2, pp. 76-85, 2018. DOI: 10.14346/JKOSOS.2018.33.2.76.

[ACM Style]

박준원, 이상호, 김성훈, 원정훈, and 윤영철. 2018. BIM-Based Virtual Construction Simulation for Steel Girder Installation Crossing the High-Speed Railway. Journal of the Korean Society of Safety, 33, 2, (2018), 76-85. DOI: 10.14346/JKOSOS.2018.33.2.76.