A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan
Vol. 37, No. 3, pp. 34-44,
Jun. 2022
10.14346/JKOSOS.2022.37.3.34
PDF
Abstract
This study analyzed the smart construction safety cost included in safety management plans that are approved before construction. Specifically, it refers to the cost incurred in constructing and operating a safety management system using wireless communication and facilities. Based on the obtained statistical results, an activation policy for the inclusion of the smart construction safety cost in building safety management plans was proposed. The smart construction safety cost must be included in the safety management cost; notably, this is mandated by the Construction Technology Promotion Act. However, there are some problems with the inclusion of smart construction safety costs. To analyze the problems encountered when calculating the smart construction safety cost and including it in safety management plans, in this study, statistical analysis was performed using the data of 1,334 safety management plans received at the Construction Safety Management Integrated Information (CSI) from June to August 2021. The results show that only 50.7% of the safety management plans included the smart construction safety cost although the current law mandates 100% inclusion of these costs. Thus, it is apparent that the smart construction safety costs are only included in a low proportion of sites. In addition, the calculated smart construction safety costs were shown to have a small correlation with the construction cost; moreover, they appeared to be distributed at a constant cost level. In this context, it is believed that perfunctory cost calculations were performed at most sites since the effect of the construction cost on the smart construction safety cost was negligible. Therefore, it is necessary to improve the inclusion of smart construction safety costs by strengthening the authorization process of the approval institute of safety management plans. In addition, institutional support, such as guidelines that promote the calculation and inclusion of appropriate smart construction safety costs according to the characteristics of sites, are needed.
Statistics
Cumulative Counts from November, 2022
Multiple requests among the same browser session are counted as one view. If you mouse over a chart, the values of data points will be shown.
Cite this article
[IEEE Style]
원정훈, 장남권, 유지영, "A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan," Journal of the Korean Society of Safety, vol. 37, no. 3, pp. 34-44, 2022. DOI: 10.14346/JKOSOS.2022.37.3.34.
[ACM Style]
원정훈, 장남권, and 유지영. 2022. A Study on Activation Policy of Smart Construction Safety Cost by Analyzing Actually Estimated Amount in Safety Management Plan. Journal of the Korean Society of Safety, 37, 3, (2022), 34-44. DOI: 10.14346/JKOSOS.2022.37.3.34.