Plan for Risk Reduction of Smart Factory Process through Accident Analysis and Status Survey 


Vol. 37,  No. 5, pp. 22-32, Oct.  2022
10.14346/JKOSOS.2022.37.5.32


PDF
  Abstract

The domestic smart factory is being built and spread rapidly, mainly by mid-sized companies and large enterprises according to the government's active introduction and support policy. But these factories only promote production system and efficiency, so harmfulness and risk factors are not considered. Therefore, to derive harmful risk factors in terms of industrial safety for 12,983 government-supported smart factory workplaces from 2014 to 2019, industrial accident status analysis compared workplaces with automation facilities and government-supported workplaces with automation facilities. Also, to reduce risks associated with domestic smart factory processes, twenty government-supported workplaces with automation facilities underwent analysis, evaluating risks through a status survey using the process evaluation table. In addition, the status survey considered region, size, industry, construction level, and accident rate; the difference in risk according to the structure of the process was confirmed. Based on the smart factory process evaluation results, statistical analysis confirmed that serial, parallel, and hybrid structures pose different risk levels and that the risks of mixed structures are greater. Finally, safety control system application was presented for risk assessment and reduction in the smart factory process, reflecting the results of disaster analysis and actual condition investigation.

  Statistics
Cumulative Counts from November, 2022
Multiple requests among the same browser session are counted as one view. If you mouse over a chart, the values of data points will be shown.


  Cite this article

[IEEE Style]

변정환, "Plan for Risk Reduction of Smart Factory Process through Accident Analysis and Status Survey," Journal of the Korean Society of Safety, vol. 37, no. 5, pp. 22-32, 2022. DOI: 10.14346/JKOSOS.2022.37.5.32.

[ACM Style]

변정환. 2022. Plan for Risk Reduction of Smart Factory Process through Accident Analysis and Status Survey. Journal of the Korean Society of Safety, 37, 5, (2022), 22-32. DOI: 10.14346/JKOSOS.2022.37.5.32.